Question 1
ప్రశ్న 1
A contractor delivers stones for a load-bearing random rubble foundation wall. Several stones show visible cracks, weathered seams and friable portions, although their external dimensions satisfy the drawings. What is the most appropriate acceptance decision?
Explanation:
The suitability of building stone depends on its condition as well as its dimensions. Cracks, weathered seams and friable portions may reduce the reliability of a masonry unit. Such defects are particularly important in foundations carrying compressive loads. The contractor should segregate unsuitable stones and arrange verification of the remaining material against the specification. Mortar cannot be assumed to restore the structural integrity of a defective stone.
వివరణ:
Question 2
ప్రశ్న 2
During construction of a vertically loaded stone masonry pier, a mason proposes laying stratified sedimentary stones with their natural bedding planes vertical. What laying arrangement is normally required?
Explanation:
Stratified stones possess natural bedding planes formed during their geological formation. These planes can influence the response of the stone to loading. In ordinary vertically loaded masonry, stones should be laid with their natural beds approximately horizontal. This arrangement makes the principal vertical compressive pressure act perpendicular to the bedding planes. The correct orientation is an important part of masonry laying specifications.
వివరణ:
Question 3
ప్రశ్న 3
Absorbent building stones are being placed completely dry in fresh cement mortar. The mason observes rapid loss of mortar moisture near the contact surfaces. Which corrective procedure is most appropriate?
Explanation:
Absorbent dry stones can draw water from freshly prepared cement mortar. Excessive suction may affect workability and adhesion at the bedding surface. Appropriate pre-wetting helps reduce the rapid removal of mortar water. Stones should nevertheless be laid in a condition that permits proper contact with the mortar. This procedure improves the consistency of masonry workmanship.
వివరణ:
Question 4
ప్రశ్న 4
A stone masonry specification requires cement mortar in the volumetric proportion 1:4, meaning one part cement to four parts dry sand. For a simplified batching calculation, the total combined DRY ingredient volume is exactly 0.75 m3, and no volume-change allowance is required. What are the cement and sand volumes respectively?
Explanation:
A cement-to-sand ratio of 1:4 represents five total volumetric parts. The specified combined dry ingredient volume is 0.75 m3. One part is therefore 0.75/5 = 0.15 m3. Cement requires one part, or 0.15 m3, while sand requires four parts, or 0.60 m3. These values describe dry batching quantities and should not be treated as the yield of finished wet mortar.
వివరణ:
Question 5
ప్రశ్న 5
A project specifies random rubble masonry brought to courses rather than completely uncoursed random rubble masonry. Which construction procedure best satisfies this specification?
Explanation:
Random rubble masonry uses stones that are comparatively irregular in shape and size. In the brought-to-courses form, the work is periodically brought to approximately horizontal levels. This differs from completely uncoursed rubble, which does not follow the same periodic levelling arrangement. The mason must still maintain suitable bond and properly filled joints. Bringing the work to courses does not require the uniformly precise dressing associated with plain ashlar masonry.
వివరణ:
Question 6
ప్రశ్న 6
A specification requires first-sort coursed squared rubble masonry for an exposed pump-house wall. Which workmanship requirement is most appropriate?
Explanation:
Coursed squared rubble masonry requires more regular stone preparation than ordinary random rubble masonry. Stones are dressed sufficiently to obtain approximately rectangular forms and suitable contact surfaces. The courses should be constructed to the specified levels. Bed and side joints must satisfy the workmanship requirements applicable to the specified class. The term rubble does not permit arbitrary dressing, poor bonding or unfilled joints.
వివరణ:
Question 7
ప్రశ్న 7
Under the general jointing provisions of IS 1597 (Part 1), what are the maximum mortar-joint thicknesses for random rubble masonry and squared rubble masonry respectively?
Explanation:
Different classes of stone masonry require different degrees of fitting and dressing. IS 1597 (Part 1) specifies a maximum joint thickness of 20 mm for random rubble masonry. The corresponding maximum for squared rubble masonry is 10 mm. Squared rubble permits closer jointing because its stones receive more regular dressing. These values must not be confused with the finer joint limits applicable to ashlar masonry.
వివరణ:
Question 8
ప్రశ్న 8
Under IS 1597 (Part 2), which pair correctly states the general maximum mortar-joint thickness for ordinary ashlar masonry and the permitted maximum for ashlar block-in-course masonry?
Explanation:
Ashlar masonry uses carefully dressed stones that permit relatively fine mortar joints. The general maximum joint thickness prescribed in IS 1597 (Part 2) is 3 mm. The block-in-course variety is permitted a maximum joint thickness of 6 mm. These limits reflect the distinct workmanship requirements of ashlar masonry. Applying random rubble joint limits to ordinary ashlar work would therefore be incorrect.
వివరణ:
Question 9
ప్రశ్న 9
During inspection of random rubble masonry in cement mortar, the engineer discovers that the hearting consists mainly of very small stone fragments placed loosely between the face stones. Which correction is appropriate?
Explanation:
Hearting forms the interior filling of a rubble masonry wall. It should contribute to a solid masonry section rather than function as loose packing. IS 1597 (Part 1) requires suitable rubble hearting stones not less than 150 mm in any direction for the specified random rubble construction. These stones should be carefully positioned and solidly bedded in mortar. Proper hearting helps connect the external portions of the wall into a coherent masonry mass.
వివరణ:
Question 10
ప్రశ్న 10
A mason proposes supporting large hearting stones on small loose chips to raise them to the level of the face stones. Which interpretation of random rubble masonry workmanship is correct?
Explanation:
Small chips can assist in filling suitable interstices in rubble masonry. Their use does not justify the substitution of loose packing for properly bedded hearting. IS 1597 (Part 1) specifically discourages using chips beneath hearting stones to raise their levels. The main hearting stones should be adequately supported in mortar. Excessive chip packing can lead to poor contact and an unsatisfactory interior masonry section.
వివరణ:
Question 11
ప్రశ్న 11
A sound, relatively nonporous random rubble wall is 550 mm thick, and the design requires transverse bond stones in accordance with IS 1597 (Part 1). Which arrangement is most appropriate?
Explanation:
Bond stones provide a transverse connection between different portions of a stone masonry wall. For the stated relatively nonporous rubble wall, the specified thickness is within the range where through bonding is appropriate. IS 1597 (Part 1) provides for through bond stones in walls up to 600 mm thick. Their positions and arrangement must satisfy the applicable bonding provisions. This helps prevent the wall from behaving as inadequately connected facing and backing shells.
వివరణ:
Question 12
ప్రశ్న 12
A stone masonry wall is built using highly absorbent porous sandstone. The contractor proposes using single continuous through stones at all transverse-bond locations. What is the more appropriate specification-based arrangement?
Explanation:
Transverse bonding remains necessary even when the stones are relatively porous. A single continuous porous through stone can provide a path for moisture penetration across the wall. The stone masonry provisions therefore recognize the use of overlapping bond stones for highly absorbent materials. The individual stones should extend adequately into the wall and overlap sufficiently. This arrangement provides transverse continuity while addressing the moisture-related concern.
వివరణ:
Question 13
ప్రశ్న 13
A 0.75 m thick rubble masonry wall requires overlapping bond stones. Two bond stones project inward from opposite faces by 0.48 m and 0.42 m respectively. Their positions are laterally staggered so that the stones do not occupy the same physical space, but their lengths overlap when projected along the wall-thickness direction. What is the projected overlap length?
Explanation:
Each stone penetrates inward from its respective face of the 0.75 m thick wall. The sum of their penetration lengths is 0.48 + 0.42 = 0.90 m. The projected overlap is obtained by subtracting the wall thickness: 0.90 - 0.75 = 0.15 m. This equals 150 mm, which is the minimum overlap specified for a set of overlapping bond stones under IS 1597 (Part 1). The stones are laterally staggered so that overlapping projections do not imply physically occupying the same space.
వివరణ:
Question 14
ప్రశ్న 14
A random rubble wall corner is constructed with several small irregular stones forming an unstable quoin, and successive courses provide little interlocking with the adjoining wall. Which correction is most appropriate?
Explanation:
Quoin stones form the external angles of masonry walls and require careful selection. Their proper dressing helps establish the intended geometry of the corner. Alternate header and stretcher arrangements improve connection between the adjoining wall portions. Poorly interlocked corners can create weak vertical discontinuities. The corner should therefore be corrected to meet the specified bonding and workmanship requirements.
వివరణ:
Question 15
ప్రశ్న 15
Construction of a rubble masonry wall must be interrupted, but the unfinished end will subsequently be bonded with newly constructed masonry. Which temporary termination is consistent with IS 1597 (Part 1)?
Explanation:
Unfinished masonry should be arranged so that subsequent work can be properly joined. Racking back produces a stepped termination instead of a continuous unbonded vertical plane. IS 1597 (Part 1) limits the raking profile to an angle not exceeding 45 degrees to the horizontal. The stepped arrangement facilitates interlocking of the old and new masonry. This requirement should not be confused with the different raking-back angle specified for ashlar masonry.
వివరణ:
Question 16
ప్రశ్న 16
An exposed ashlar masonry wall contains stones with damaged arrises and inaccurately dressed bedding surfaces. The contractor proposes using thick mortar joints to conceal these defects. What should the engineer require?
Explanation:
Ashlar masonry depends on accurately dressed stone units and properly formed joints. Damaged arrises can impair the required appearance and accuracy of exposed stonework. Irregular bedding surfaces may prevent satisfactory contact between adjoining stones. Excessively thick mortar joints are not an acceptable substitute for the specified dressing quality. Defective units should be corrected or replaced according to the approved workmanship requirements.
వివరణ:
Question 17
ప్రశ్న 17
A contractor proposes building a thick rubble masonry wall using two thin external stone skins and loose dry aggregate between them, with only occasional through stones. Which assessment is technically correct?
Explanation:
A rubble masonry wall should act as an adequately connected and solidly constructed mass. Thin facing shells supported by loose dry packing do not provide the intended workmanship quality. Proper hearting must be laid and bedded in mortar. Suitable transverse bonds are also required to connect the wall faces. IS 1597 (Part 1) specifically prohibits construction based on inadequately bonded thin faces and loose dry packing.
వివరణ:
Question 18
ప్రశ్న 18
A work order specifies coursed squared rubble masonry, but the contractor submits uniformly fine-dressed rectangular ashlar blocks and seeks payment automatically at the coursed-rubble rate. Which response is most appropriate?
Explanation:
Coursed squared rubble and ashlar masonry are distinct construction descriptions. They differ in stone preparation, jointing and the expected quality of finished work. A contractor should not independently change the specified masonry class without approval. The applicable contract determines how an accepted substitution is measured and valued. The estimate should preserve the correct distinction rather than assuming that all stone masonry attracts an identical rate.
వివరణ:
Question 19
ప్రశ్న 19
A stone masonry wall has been constructed in cement mortar during hot weather. Which curing procedure is consistent with IS 1597 stone masonry guidance?
Explanation:
Cement mortar requires suitable moisture conditions for continued hydration. Premature drying can adversely affect mortar performance and joint quality. IS 1597 provides for moist curing of stone masonry constructed in cement or composite mortar for at least seven days. Watering should be carried out carefully so that fresh mortar is not displaced. The work must also be protected against damaging rain and other adverse exposure during construction.
వివరణ:
Question 20
ప్రశ్న 20
An exposed ashlar wall is being constructed at considerable height, and the contractor proposes single scaffolding supported by holes in the finished stonework. Which arrangement is more appropriate under IS 1597 (Part 2)?
Explanation:
Ashlar masonry often has carefully finished faces that require protection during construction. IS 1597 (Part 2) provides for double scaffolding in ashlar work. Independent support reduces the need to disturb the finished masonry face. The scaffold must also be designed and maintained for the anticipated construction loads. Proper access arrangements are both workmanship and safety requirements.
వివరణ:
Question 21
ప్రశ్న 21
A door frame must be incorporated into a rubble stone masonry wall. The site team proposes fixing it only by wedging small loose stones between the frame and surrounding masonry. Which alternative is most appropriate?
Explanation:
Door frames require adequate connection to the surrounding masonry. Loose stone wedges do not provide a dependable substitute for the specified anchorage. Suitable holdfasts or other approved fixings should be securely embedded in the work. The adjoining jamb stones must also be properly positioned and bonded. The frame should be checked for line, level and plumb during installation.
వివరణ:
Question 22
ప్రశ్న 22
A rectangular rubble stone masonry wall has a measured length of 7.20 m, height of 2.50 m and uniform thickness of 0.60 m. It contains one full-thickness opening measuring 1.20 m by 1.50 m. For this problem, deduct the FULL opening volume and make no other adjustments. What is the net masonry volume?
Explanation:
The gross masonry volume is 7.20 x 2.50 x 0.60 = 10.800 m3. The opening has a face area of 1.20 x 1.50 = 1.80 m2. Its full volume through the wall is 1.80 x 0.60 = 1.080 m3. The specified deduction is therefore 1.080 m3. The net stone masonry volume is 10.800 - 1.080 = 9.720 m3.
వివరణ:
Question 23
ప్రశ్న 23
A straight stone masonry foundation segment is 12.00 m long, with no intersecting walls or openings. It contains two vertically separate centred courses: a lower course 0.80 m wide and 0.35 m high, and an upper course 0.60 m wide and 0.25 m high. Both courses are built in cement mortar and measured by their gross geometrical masonry volumes. What is the combined quantity?
Explanation:
The two foundation courses have different widths and heights. The lower-course volume is 12.00 x 0.80 x 0.35 = 3.360 m3. The upper-course volume is 12.00 x 0.60 x 0.25 = 1.800 m3. They occupy separate vertical levels and must both be included in the take-off. The combined stone masonry quantity is 3.360 + 1.800 = 5.160 m3.
వివరణ:
Question 24
ప్రశ్న 24
A straight stone masonry retaining-wall section is 10.00 m long and 2.00 m high. Its thickness tapers uniformly and linearly from 0.90 m at the base to 0.50 m at the top, giving a trapezoidal vertical cross-section. There are no openings, projections or deductions. What is the gross masonry volume?
Explanation:
The vertical cross-section is trapezoidal because the wall thickness decreases linearly with height. The mean thickness is (0.90 + 0.50)/2 = 0.70 m. The cross-sectional area is 0.70 x 2.00 = 1.40 m2. Multiplying this area by the wall length gives 1.40 x 10.00 = 14.00 m3. This quantity represents the gross masonry volume under the stated geometrical assumptions.
వివరణ:
Question 25
ప్రశ్న 25
A detailed estimate contains random rubble foundation masonry, exposed dressed ashlar masonry and separately specified pointing to some masonry faces. Which measurement and rate-checking approach is most appropriate?
Explanation:
Different stone masonry classes involve different material preparation and workmanship requirements. Their item descriptions should therefore identify the work actually specified. Masonry volume should be derived from the applicable dimensions and measurement provisions. Pointing and exposed-face finishing must be checked against the inclusions in the relevant masonry rates. Separate descriptions and consistent measurement prevent omissions, duplicate costs and incorrect comparisons between estimates.
వివరణ:
Answer Key సమాధానాల పట్టిక
-
Question 1 ప్రశ్న 1Answer: B. Reject or segregate the defective stones and verify that the remaining material satisfies the specified soundness, durability and workmanship requirements. సమాధానం: B.
-
Question 2 ప్రశ్న 2Answer: D. Lay the stones so that the compressive pressure acts approximately perpendicular to their natural bedding planes. సమాధానం: D.
-
Question 3 ప్రశ్న 3Answer: A. Sufficiently wet the stones before laying to control suction, while avoiding an unsuitable layer of free surface water. సమాధానం: A.
-
Question 4 ప్రశ్న 4Answer: C. 0.150 m3 cement and 0.600 m3 sand. సమాధానం: C.
-
Question 5 ప్రశ్న 5Answer: B. Arrange selected irregular stones in suitable bond and bring the masonry approximately to level courses at the required intervals. సమాధానం: B.
-
Question 6 ప్రశ్న 6Answer: A. Hammer-dress the beds and joints to approximately rectangular shapes, form properly level courses, and maintain the specified closer fitting of stones. సమాధానం: A.
-
Question 7 ప్రశ్న 7Answer: D. 20 mm for random rubble and 10 mm for squared rubble. సమాధానం: D.
-
Question 8 ప్రశ్న 8Answer: C. 3 mm and 6 mm respectively. సమాధానం: C.
-
Question 9 ప్రశ్న 9Answer: B. Use suitably sized hearting stones, solidly bed them in mortar, and bring the hearting approximately level with the facing and backing. సమాధానం: B.
-
Question 10 ప్రశ్న 10Answer: D. Chips should be restricted to suitable interstices between adjacent hearting stones and should not be used as loose supports beneath hearting stones. సమాధానం: D.
-
Question 11 ప్రశ్న 11Answer: A. Provide suitable through bond stones extending across the wall thickness at the required locations, ensuring effective connection between the faces. సమాధానం: A.
-
Question 12 ప్రశ్న 12Answer: C. Use suitably arranged overlapping bond stones extending inward from opposite faces, with the required overlap, to maintain bonding while reducing the possibility of damp penetration through a single continuous stone. సమాధానం: C.
-
Question 13 ప్రశ్న 13Answer: B. 0.15 m. సమాధానం: B.
-
Question 14 ప్రశ్న 14Answer: A. Provide selected, suitably dressed quoin stones and arrange headers and stretchers alternately to develop proper bonding at the corner. సమాధానం: A.
-
Question 15 ప్రశ్న 15Answer: D. Rack the unfinished masonry back in sufficiently long steps, with the stepped profile not steeper than 45 degrees to the horizontal. సమాధానం: D.
-
Question 16 ప్రశ్న 16Answer: C. Use stones dressed to the required dimensions and surface accuracy, protect their edges, and maintain the specified fine joints. సమాధానం: C.
-
Question 17 ప్రశ్న 17Answer: A. The arrangement is unacceptable because the facing, hearting and transverse bonding must form a solid, properly mortared masonry wall. సమాధానం: A.
-
Question 18 ప్రశ్న 18Answer: B. Require approval of the proposed substitution and apply the correct contractual item description and valuation, recognizing the different dressing and jointing requirements. సమాధానం: B.
-
Question 19 ప్రశ్న 19Answer: C. Protect the fresh work and maintain adequate moisture on the masonry faces for a minimum period of seven days, without washing out green mortar. సమాధానం: C.
-
Question 20 ప్రశ్న 20Answer: D. Provide properly designed double scaffolding with two sets of vertical supports, protecting the dressed masonry faces. సమాధానం: D.
-
Question 21 ప్రశ్న 21Answer: B. Use approved holdfasts or other specified anchorage securely embedded in prepared masonry or concrete pockets, while maintaining the required jamb geometry and bond. సమాధానం: B.
-
Question 22 ప్రశ్న 22Answer: A. 9.720 m3. సమాధానం: A.
-
Question 23 ప్రశ్న 23Answer: C. 5.160 m3. సమాధానం: C.
-
Question 24 ప్రశ్న 24Answer: D. 14.00 m3. సమాధానం: D.
-
Question 25 ప్రశ్న 25Answer: A. Describe the masonry classes separately, calculate their applicable quantities, and check whether pointing and finishing are included in or excluded from the respective item rates. సమాధానం: A.