Question 1
ప్రశ్న 1
Which sequence best represents the conventional stages of engineering surveys for selecting a new highway alignment, recognizing that current IRC guidance includes map study within reconnaissance?
Explanation:
The conventional textbook sequence begins by studying available maps and identifying route alternatives. Reconnaissance then examines these alternatives at a broad field level. Preliminary surveys collect more accurate measurements for comparing and refining feasible alignments. Final location and detailed surveys establish the selected route and supply construction-level data. In IRC:SP:19-2020, map study is expressly included among reconnaissance activities, so the textbook stages should not be mistaken for four rigidly independent modern contracts.
వివరణ:
Question 2
ప్రశ్న 2
A topographic map shows two possible mountain crossings: Route P follows a natural saddle, while Route Q crosses a much higher ridge. What is the most appropriate use of this information at the map-study stage?
Explanation:
Contour maps can help locate saddles, ridges, valleys and possible river crossings. A mountain pass or saddle may offer a manageable crossing elevation. At map-study level, the information is sufficient to shortlist alternatives rather than finalize geometry. Geological conditions and ground accessibility still require field verification. Reconnaissance should therefore examine Route P before any final alignment decision.
వివరణ:
Question 3
ప్రశ్న 3
On a topographic map at a scale of 1:50,000, a tentative route measures 9.0 cm along its traced centre line. What approximate ground length does this represent, neglecting map distortion?
Explanation:
A map scale of 1:50,000 means one unit on the map represents 50,000 of the same units on the ground. Nine centimetres therefore represent 450,000 centimetres. Dividing by 100 converts this distance to 4,500 metres. The corresponding ground length is 4.5 kilometres. This estimate is useful in early route comparison but does not replace a surveyed centre-line length.
వివరణ:
Question 4
ప్రశ్న 4
An office study identifies three plausible corridors, but local maps do not establish whether a stream bank is eroding or whether a hillside is unstable. What is the appropriate next survey activity?
Explanation:
Reconnaissance tests the broad feasibility of alternatives identified from available information. Field inspection can reveal bank erosion, unstable slopes, existing access and other features not apparent on maps. The observations also guide the scope of later investigation. The findings should support approximate comparisons rather than construction-level setting out. A preliminary instrument survey can then concentrate on the more promising alternatives.
వివరణ:
Question 5
ప్రశ్న 5
A proposed road passes through a remote forested gorge that cannot safely be inspected along its full length during initial reconnaissance. Which approach is most defensible?
Explanation:
Aerial reconnaissance can provide useful observations where ground access is difficult. Satellite images or UAV data can help identify terrain breaks and possible route obstacles. Remote imagery does not directly establish subgrade strength or subsurface geology. Important uncertainties must therefore be addressed through suitable later investigations. Modern survey technology supplements engineering judgement rather than removing the need for ground verification.
వివరణ:
Question 6
ప్రశ్న 6
During preparation of a new highway, the authority needs accurately tied locations of buildings, utilities, streams, relief and traverse control along shortlisted corridors. Which stage is principally intended to collect these data for selecting the final centre line?
Explanation:
The preliminary survey is a relatively large-scale instrument survey of a promising alignment corridor. It establishes a reliable traverse and locates features that affect highway location. Longitudinal profiles and cross-sections can also be developed at this stage. The information permits geometrically and economically meaningful comparisons of alternatives. It forms a basis for choosing the final centre line in the design office.
వివరణ:
Question 7
ప్రశ్న 7
An alignment has been selected after comparing preliminary survey plans and obtaining the necessary project approval. Which operation most directly belongs to the final location survey?
Explanation:
Final location follows the selection of an alignment from earlier investigations. Its primary operation is to establish the selected centre line on the ground. Control stations, reference points and benchmarks support accurate setting out. Detailed levels and cross-sections provide inputs to working drawings and quantities. The purpose is no longer merely to screen broad alternative corridors.
వివరణ:
Question 8
ప్రశ్న 8
A preliminary survey discovers a religious structure and an underground water main within a tentative highway corridor, although neither appeared in the initial digital map. What is the best engineering response?
Explanation:
Preliminary surveys should capture physical features affecting alignment and construction. A structure or buried utility may impose geometric, legal and financial constraints. Accurate positions allow designers to test feasible local shifts of the centre line. Utility owners and other responsible agencies may need to be consulted. Ignoring newly discovered obstructions can cause avoidable redesign and construction delays.
వివరణ:
Question 9
ప్రశ్న 9
A designer wants to prepare a road's longitudinal profile and identify gradients, summit or valley locations, and the need for cut or fill along the selected centre line. Which surveyed dataset is most directly required?
Explanation:
A longitudinal profile plots ground elevation against distance along the road. Surveyed reduced levels at known chainages establish the terrain profile. They support selection of the formation grade and design of vertical curves. The difference between ground and design levels indicates potential cut and fill. Traffic and materials data remain relevant to other design decisions but cannot replace this elevation dataset.
వివరణ:
Question 10
ప్రశ్న 10
A surveyor takes transverse ground levels to both sides of a proposed road centre line at regular and critical chainages. What is the principal use of these cross-sectional observations?
Explanation:
Cross-sections describe ground levels across the road corridor at specified chainages. They show how the proposed formation relates to side slopes and local terrain. Designers can use them to calculate cutting and embankment areas. They also assist the layout of side drains and ancillary works. The amount of detail and spacing should suit terrain variation and project requirements.
వివరణ:
Question 11
ప్రశ్న 11
The levelling team establishes reference benchmarks tied to a known datum before repeated highway profile surveys. Why is this control necessary?
Explanation:
A benchmark has an assigned or established reduced level relative to a datum. It provides a reference for transferring elevations throughout the project. Consistent reference levels are essential when design surveys are repeated. They help connect the elevations of the road, bridges and drainage structures. Appropriate closure checks and control verification remain necessary despite the presence of benchmarks.
వివరణ:
Question 12
ప్రశ్న 12
Two mapped contour points on a possible route have elevations of 120 m and 150 m, separated by 600 m of horizontal route distance. If a uniform rise is assumed, what approximate gradient is indicated for preliminary screening?
Explanation:
The rise between the two points is 150 minus 120 = 30 metres. The stated horizontal route distance is 600 metres. Gradient equals elevation change divided by horizontal distance. The result is 30/600 multiplied by 100, or 5.0 percent. This is an initial feasibility estimate and must be checked with actual surveyed profiles and applicable geometric criteria.
వివరణ:
Question 13
ప్రశ్న 13
A preliminary longitudinal survey records RL = 102.5 m at chainage 0+600 and RL = 130.5 m at chainage 1+400. Assuming the intervening ground profile is represented by a uniform grade, what is the mean upward gradient?
Explanation:
The chainage difference is 1,400 minus 600 = 800 metres. The ground elevation rise is 130.5 minus 102.5 = 28 metres. The mean gradient is therefore 28 divided by 800. Multiplying by 100 gives 3.5 percent. A detailed longitudinal profile may show local variations that are hidden by this mean value.
వివరణ:
Question 14
ప్రశ్న 14
At one surveyed road cross-section, cutting has a level bottom width of 8 m and a uniform vertical depth of 2 m. Both cut slopes are 1 horizontal to 1 vertical, and the original ground is assumed level transversely. What is the cross-sectional excavation area?
Explanation:
The central rectangular portion has area 8 times 2 = 16 square metres. Each 1H:1V side slope extends horizontally by 2 metres at the stated depth. Each triangular side area is one half times 2 times 2 = 2 square metres. The two sides therefore add 4 square metres to the rectangle. Total excavation area is 20 square metres under the stated idealized cross-section.
వివరణ:
Question 15
ప్రశ్న 15
Two successive surveyed earthwork cross-sections, 40 m apart, have cut areas of 20 m2 and 30 m2. Using the average-end-area method, what is the estimated excavation volume between them?
Explanation:
The average-end-area method multiplies the mean of the two end areas by their separation. The average area is (20 + 30)/2 = 25 square metres. The stated interval length is 40 metres. The estimated cut volume is 25 times 40 = 1,000 cubic metres. This method approximates the earthwork between sections and assumes reasonably representative intervening geometry.
వివరణ:
Question 16
ప్రశ్న 16
A highway bypass study must distinguish traffic that passes completely through a town from trips with origins or destinations inside it. Which traffic investigation is most directly suited to this decision?
Explanation:
An origin-destination survey establishes where representative trips start and finish. It helps distinguish through movement from trips serving the town itself. Classified counts estimate traffic volume and vehicle composition on existing routes. These data support forecasting potential diversion to a bypass. A traffic-volume count alone cannot fully identify the origin and destination pattern of travellers.
వివరణ:
Question 17
ప్రశ్న 17
A proposed widening scheme has adequate traffic-volume counts, but pavement designers also require information on heavy-vehicle load severity. Which additional investigation is most relevant?
Explanation:
Classified counts show how many vehicles of different categories use a road. They do not fully describe the actual loads imposed by commercial vehicle axles. Axle-load surveys measure load characteristics relevant to pavement loading assessments. These results can support design traffic evaluation when used with vehicle counts and projections. Roadside or groundwater surveys cannot substitute for this load information.
వివరణ:
Question 18
ప్రశ్న 18
A preliminary highway survey crosses a floodplain where the team has only measured channel width during the dry season. Which additional information is essential before selecting cross-drainage locations and preliminary formation levels?
Explanation:
Dry-season channel width does not establish the design flood condition. The contributing catchment and drainage network influence the quantity and direction of runoff. Flood levels and local records help identify inundation and possible backwater effects. Drainage paths are necessary inputs to the location and sizing of cross-drainage structures. These investigations also influence the road's formation level and erosion protection.
వివరణ:
Question 19
ప్రశ్న 19
A preliminary alignment passes near two possible aggregate sources. Which survey programme would best support a later decision on their use in highway works?
Explanation:
Material surveys identify potentially usable sources of construction aggregate and borrow material. Adequate reserves are necessary to support the expected project quantity. Representative testing is required to judge engineering suitability for the proposed work. Transport distance and site access influence delivered material cost. Environmental and statutory conditions also affect whether a source can be used.
వివరణ:
Question 20
ప్రశ్న 20
A proposed embankment crosses an area of soft soil with a high groundwater table. Which investigation is most appropriate before finalizing its earthwork design and stability provisions?
Explanation:
An embankment imposes additional load on the underlying ground. Soft foundation strata may undergo settlement or stability problems. Groundwater conditions affect effective stress and construction feasibility. Boreholes, sampling and relevant laboratory or in-situ testing can characterize these risks. The investigation scope should be increased where high embankments or poor ground conditions are anticipated.
వివరణ:
Question 21
ప్రశ్న 21
Two reconnaissance alternatives cross a hill region, but one passes beneath a rockfall-prone cliff. Which next step best uses the findings before advancing the final centre line?
Explanation:
Reconnaissance should identify major hazards that might affect the feasibility of a corridor. Rockfall risk depends on rock structure, slope geometry and other site conditions. Specialist investigation may be needed before a route is selected. Avoidance or engineered protection can alter the relative costs of alternatives. The hazard should therefore remain an explicit part of route comparison rather than being ignored.
వివరణ:
Question 22
ప్రశ్న 22
A highway centre line has been finalized, and the authority needs accurate right-of-way boundaries and setting-out information for construction and land acquisition. Which activity is most relevant now?
Explanation:
The final location survey establishes the selected road line on the ground. Detailed surveying provides the control and coordinates needed for design and construction. It also supports defining the right-of-way and land-acquisition requirements. Permanent reference marks help recover the alignment after site activities disturb temporary pegs. A small-scale reconnaissance map alone is insufficient for accurate boundary setting out.
వివరణ:
Question 23
ప్రశ్న 23
At reconnaissance, Route A is estimated to require 50,000 m3 of excavation and a bridge costing Rs. 9 crore. Route B needs 80,000 m3 of excavation and a bridge costing Rs. 5 crore. Assume excavation costs Rs. 400/m3 for both routes, and consider only these two cost items. Which comparison is correct?
Explanation:
Route A's excavation cost is 50,000 times 400 = Rs. 20,000,000, or Rs. 2 crore. Including its bridge gives Rs. 11 crore. Route B's excavation costs 80,000 times 400 = Rs. 3.2 crore. Including its bridge gives Rs. 8.2 crore, which is Rs. 2.8 crore below Route A for these items. Final route selection still requires traffic, pavement, land, environmental and other project costs.
వివరణ:
Question 24
ప్రశ్న 24
After preliminary survey, the design office proposes a final alignment based on a digital terrain model. A later site visit reveals that a recent development has altered drainage and blocked part of the intended corridor. What is the most appropriate response?
Explanation:
A digital terrain model represents conditions captured at a particular time and resolution. Land development and drainage alterations can make parts of a model outdated. Field verification identifies such discrepancies before construction-level commitments. Designers should revise the centre line or associated works when the evidence requires it. Accurate survey control and updated records are then needed for the final location survey.
వివరణ:
Question 25
ప్రశ్న 25
A levelling survey uses a benchmark of RL 125.40 m. A backsight of 1.85 m is taken on the benchmark and a foresight of 2.60 m on a highway centre-line point from the same instrument setup. What is the RL of that point?
Explanation:
The height of instrument equals the benchmark RL plus the backsight. This gives 125.40 + 1.85 = 127.25 metres. The centre-line reduced level equals height of instrument minus foresight. Thus the point RL is 127.25 - 2.60 = 124.65 metres. A properly controlled levelling survey also uses checks to identify closing errors.
వివరణ:
Answer Key సమాధానాల పట్టిక
-
Question 1 ప్రశ్న 1Answer: B. Map study, reconnaissance, preliminary survey, and final location with detailed survey. సమాధానం: B.
-
Question 2 ప్రశ్న 2Answer: C. Identify the saddle as a potentially favourable route corridor for reconnaissance, subject to checking geology, drainage and practical access. సమాధానం: C.
-
Question 3 ప్రశ్న 3Answer: A. 4.5 km. సమాధానం: A.
-
Question 4 ప్రశ్న 4Answer: D. Undertake reconnaissance to inspect the probable corridors, verify major constraints and shortlist routes for detailed survey. సమాధానం: D.
-
Question 5 ప్రశ్న 5Answer: B. Use appropriate aerial or UAV reconnaissance to supplement maps, then investigate uncertain ground conditions by field or specialist methods where practicable. సమాధానం: B.
-
Question 6 ప్రశ్న 6Answer: A. Preliminary instrument survey. సమాధానం: A.
-
Question 7 ప్రశ్న 7Answer: C. Transfer the approved centre line to the ground, establish suitable control and reference marks, and obtain detailed levels for working drawings. సమాధానం: C.
-
Question 8 ప్రశ్న 8Answer: D. Tie the features to the traverse, verify ownership or utility information, and assess avoidance or protection options before freezing the alignment. సమాధానం: D.
-
Question 9 ప్రశ్న 9Answer: A. Chainage-wise ground reduced levels along the centre line, tied to an appropriate vertical datum. సమాధానం: A.
-
Question 10 ప్రశ్న 10Answer: B. To determine terrain shape across the corridor for roadway width, side slopes, drains and earthwork quantity calculations. సమాధానం: B.
-
Question 11 ప్రశ్న 11Answer: C. They provide a consistent elevation reference so profiles, structures and later construction levels can be compared reliably. సమాధానం: C.
-
Question 12 ప్రశ్న 12Answer: D. 5.0%. సమాధానం: D.
-
Question 13 ప్రశ్న 13Answer: A. 3.5%. సమాధానం: A.
-
Question 14 ప్రశ్న 14Answer: B. 20 m2. సమాధానం: B.
-
Question 15 ప్రశ్న 15Answer: C. 1,000 m3. సమాధానం: C.
-
Question 16 ప్రశ్న 16Answer: D. An origin-destination survey, supported by classified traffic counts and travel-pattern information. సమాధానం: D.
-
Question 17 ప్రశ్న 17Answer: A. An axle-load survey of representative commercial vehicles, together with the applicable traffic analysis. సమాధానం: A.
-
Question 18 ప్రశ్న 18Answer: B. Catchment and runoff characteristics, flood or high-water levels, drainage paths and evidence of waterlogging or scour. సమాధానం: B.
-
Question 19 ప్రశ్న 19Answer: C. Investigate available quantities, representative material properties, accessibility, transport lead and environmental or regulatory constraints. సమాధానం: C.
-
Question 20 ప్రశ్న 20Answer: D. Conduct suitable geotechnical investigations of stratification, strength, compressibility and groundwater conditions, with further testing where needed. సమాధానం: D.
-
Question 21 ప్రశ్న 21Answer: A. Flag the hazard in the alignment comparison and undertake appropriate geological or geotechnical examination of the affected corridor and feasible alternatives. సమాధానం: A.
-
Question 22 ప్రశ్న 22Answer: B. Carry out final location and detailed surveys with centre-line references, topographic details, boundaries and appropriate control points. సమాధానం: B.
-
Question 23 ప్రశ్న 23Answer: C. Route A totals Rs. 11.0 crore; Route B totals Rs. 8.2 crore, so B is lower by Rs. 2.8 crore for the specified items. సమాధానం: C.
-
Question 24 ప్రశ్న 24Answer: D. Reconcile the model with current ground conditions, revise the alignment or drainage solution as necessary, and verify changes before final setting out. సమాధానం: D.
-
Question 25 ప్రశ్న 25Answer: A. 124.65 m. సమాధానం: A.